Garden-fresh finds · Free shipping over $65 · Browse the beds

761 Bay St Balcony & Terrace Rehabilitation 95 Humber Roof 2023 Asphalt Pavement Rehabilitation

SKU: 53809282771

4.3
USD100.00 USD137.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Sep 22 - Sep 27

Description

2023 Asphalt Pavement Rehabilitation

Stockpiling and reinstatement of existing dimensioned stone steps

interior paint finishes and deteriorated concrete masonry units

IFT Drawings

761 Bay St Balcony & Terrace Rehabilitation 95 Humber Roof 2023 Asphalt Pavement RehabilitationThe work spans over 2 years (24 weeks per year) at all balconies and landscaped terraces throughout the building. The work generally includes the removal, stockpiling, and reinstatement of existing guardrails and divider panels, removal and replacement of metal flashings, localized concrete repairs, wholesale waterproofing system installation (thin pedestrian deck on balconies and non landscaped terraces, and cold applied waterproofing on landscaped

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products